Mark A Burgess

Mark Burgess Architects Macclesfield Cheshire Manchester

Please call or, yes you can even text, 01625 682846.

  • Home
  • About
  • Services
  • Gallery
    • Metal Roof in Deep Extension
    • Hale Re-Modelling
    • Little Budworth Family Home, Cheshire.
    • Bowdon family home transformed with TLC!
    • Altrincham architect transforms home.
    • Ecton Avenue family home.
    • Renovation means the family stays!
    • Orangery replaces conservatory for luxurious comfort.
    • Forever home.
    • Conservation area design in Prestbury
    • Alderley Edge garage conversion & Cedral cladding boards.
    • Sandbach Townhouse.
    • Porch brings spatial flow.
    • Oak frame in Wilmslow, Cheshire.
    • Macclesfield takeaways vital ingredient at George’s.
    • Bifold doors in Milan villa unite house and garden.
    • Sky Frame pocket corner doors instead of bifolds.
    • Design for sunlight in Macclesfield instead of new house!
    • Sale kitchen
    • Architects studio Macclesfield
    • Alderley Edge builders restore conservatory
    • Architectural design creates multi-functional space in Adlington.
    • Loft conversion in Siddington
    • Architects conversion project in Dobcross
    • Oak framed house in Prestbury.
    • Planning approval garden worth £’000s
  • Cost
  • FAQs
  • Contact

What are the CDM Regulations?

28/10/2025 by Mark

A

What are the CDM Regulations?

The Construction (Design and Management) Regulations 2015 are legislation about protection of health and safety in connection with the design, construction, maintenance and eventual demolition of buildings. Read more here at the HSE website.

They apply to construction of all buildings including extensions to private homes and new houses. If you are the client for construction, and it involves more than one tradesperson (so it is not a one-off repair, for example) you have certain duties. Key amongst them is a duty to appoint a Principal Designer (PD) and a Principal Contractor (PC).

On a project to extend your home, if you do not appointment a PD, then the designer you appoint will automatically become the PD. (And the builder you employ automatically becomes the Principal Contactor). Both PD and PC have no choice but to accept their roles. And carry out their duties in them.

Back to Top
riba logo

©2025 Mark A Burgess MA RIBA Chartered Architect.
Thinkingpencil Limited. Company registered in England number 07477705.
27 Chapel Street Macclesfield Cheshire SK11 6TA.
Registered with the Architects Registration Board. Website by Sue Fernandes at Instilled